Post-freeze panel failures across McLennan County
The Feb 2021 freeze sent every Waco electrical shop into six weeks of panel-replacement and generator-hookup calls. A 3-truck shop covering Loop 340 and the Hewitt-area took 40+ inbound calls the first Monday the power came back—half were panel arcing, half were no-heat-trace-on-pipes follow-ons that needed a sparky before the plumber could start. If you were in an attic in Castle Heights running a new sub-panel feed, those calls rolled to voicemail. The customers who didn't hear back by lunch called the next shop. Narlo replies in 10 seconds, asks if it's a panel issue or a breaker trip, gets the Oncor meter number, and books the visit into your CRM while you're still on the first job.